pic

NEWS CENTER

/
/
/
The company conducts special supervision on the "three preventions in rainy season" of all units

The company conducts special supervision on the "three preventions in rainy season" of all units

  • Categories:Grassroots news
  • Author:
  • Origin:
  • Time of issue:2020-07-01
  • Views:

(Summary description)In response to frequent thunderstorms in the near future, in order to conscientiously do the "three preventions in rainy season" work to ensure the safety of the mine during the flood season.

The company conducts special supervision on the "three preventions in rainy season" of all units

(Summary description)In response to frequent thunderstorms in the near future, in order to conscientiously do the "three preventions in rainy season" work to ensure the safety of the mine during the flood season.

  • Categories:Grassroots news
  • Author:
  • Origin:
  • Time of issue:2020-07-01 08:52
  • Views:
Information

  In response to frequent thunderstorms in the near future, in order to conscientiously do the "three preventions in rainy season" work to ensure the safety of the mine during the flood season.

  On June 30, the senior executives and department managers of Qinhe Energy Company went to subordinate units in three ways to carry out the special supervision of "three preventions in rainy season ."

 

 

  In Yonghong mine , causing drainage of water during the rainy season for the recent big reasons the platform to the east corner collapse, general manager Yan strengthen a line straight back to the mine construction site, conduct field visits and in-depth exchanges and on-site personnel.

  Yan strengthened the requirements: The platform repair project must ensure the construction period, ensure the quality, comprehensive consideration, scientific construction, and reasonably solve the coal yard drainage problem to ensure the completion of the project with quality and quantity. At the same time, the mine must firmly establish a sense of responsibility and target special geographical conditions Formulate more scientific and reasonable "three preventions" measures in the rainy season, implement and compact responsibilities at all levels, and earnestly grasp the "three preventions" work in the rainy season.

 

 

  Subsequently, Yan led to strengthening Wing coal production areas, coal washing plant, main wellhead, pedestrians and other places on-site investigation inclined to look, high and steep slope protection works, flood control and drainage facilities, old residential perimeter protection cases, emergency Detailed understanding of related work measures such as material reserves .

  To do a good job in the next step of flood prevention, Yan Jianqiang emphasized: We must fully implement our responsibilities to ensure that there are no dead ends in the flood prevention work. We must intensify the investigation of hidden dangers. We must implement rectification measures for the hidden dangers found in the flood prevention safety inspection, and we must cancel the numbers one by one. Consumers addition to various types of flood risks, to strengthen emergency preparedness and three defenses rainy season, do a solid job amended contingency plans, emergency stockpiles, should emergency duty and other infrastructure work, to enhance the ability of mine safety in flood season.

 

 

  In the Duanshi Coal Mine , Yan Jianqiang and his party focused on on- site inspections of key places such as coal washing plants, 35KV substations, and ground industrial squares , and asked about the preparations for the "three preventions in rainy season". Yan strengthen the "three" working end's coal mines as affirmed at the same time, the flood prevention work for matters requiring attention, strengthen Yan stressed: to achieve the "safety first, pre- prevention-oriented" to strengthen the daily flood of troubleshooting, Work in a down-to-earth manner to ensure the safety of the mine during the flood season.

 

 

  On the same day, the second and third inspection teams led by executive vice president Zhao Xijun and chief engineer Wang Guoqiang also inspected Zhongcun, Jiuxin, Qinsheng, Hou Village, Nan'ao Temple, and Qudi respectively.

Scan the QR code to read on your phone

LINK

pic
pic
pic
pic
pic
pic
这是描述信息

CONTACT

Add:No. 8, Youyi Road, Xincheng Community, Longgang Town, 
          Qinshui County, Jincheng

Group tel:0356-7069516

pic

Scan the qr codePay attention to our

 All rights reserved: QINHE ENERGY GROUP CO.LTD 京ICP备xxxxxxxx号 www.300.cn